Off-Nadir Delta

Activists occupy Microsoft data center construction site in Amsterdam

Titles and summaries are AI-extracted from news reporting; every source is linked below. Event id de468754-aef7-46b0-8e51-e6627d92cc50.

Where
Amsterdamresolved to locality52.373, 4.892
When
Occurrence date not stated by reportingFirst reported 2026-11-09 · last update 2026-11-11
Sourcing
4 reports4 outlets carrying it · independence not established
How far this got
localizednamed facility unresolvedThis signal has no sensor recommendation, so there is nothing specific to look for.

Summary

On November 10, 2026, hundreds of protesters from groups including Geef Tegengas and Fossielvrij broke into the construction site of a Microsoft data center in the Sloterdijk district of Amsterdam. The demonstrators, part of a Europe-wide campaign organized by the Stop Dirty Data Centers coalition, brought work at the facility to a standstill. Participants displayed signs and set off smoke canisters to protest the environmental impact of data centers, the influence of Big Tech, and concerns regarding AI-driven warfare. Riot police responded to the scene and detained between 150 and 200 individuals.

What imagery could confirm

Which satellite to use, what to look for and why. Part of the event detail on Pro.

What remains unresolved

  • named facility unresolved

Timeline

6 recorded change(s). The ledger starts when this event was first folded: the initial observation is not recorded as a change, so an empty timeline means nothing has moved since, not that nothing is known.

    6 change(s) before the history shown here.

    Sources

    Grouped by outlet. Syndication is not collapsed, so several outlets can carry one wire story — the count is breadth of carriage, not independent confirmation.

    Related events

    0 related event(s) and 1 place(s) or facilities — the same facility, place, actor or campaign. Part of the event detail on Pro.

    Reproduce over the API (free endpoint)

    bash
    curl "https://offnadir-delta.com/api/v1/events/de468754-aef7-46b0-8e51-e6627d92cc50/thread" \
      -H "Authorization: Bearer ond_YOUR_API_KEY"

    For situational awareness only — not for tracking or targeting individuals. Every claim above links to its reporting; satellite fields are the same values the API serves.